HOME cs.uu.nl home education contact library calendar search UU.NL
about us research people archive services jobs

publications by dr. J.A. Hoogeveen

Han  Hoogeveen

dr. J.A. Hoogeveen

some publications

Akker, J.M. van den, Dijk, T.C. van, Hoogeveen, J.A. & Toorop, T. (2011). Optimizing wireless sensor network flow by column generation. In 24th Conference of the European Chapter on Combinatorial Optimization (ECCO).

Akker, J.M. van den, Geraerts, R.J., Hoogeveen, J.A. & Prins, C.J. (2011). Path Planning in Games. In 10th Workshop on Models and Algorithms for Planning and Scheduling Problems. Nymburk, Czech Republic.

Bouman, P.C., Akker, J.M. van den & Hoogeveen, J.A. (2011). Recoverable robustness by column generation. : Department of Information and Computing Sciences, Utrecht University.

Bouman, P.C., Akker, J.M. van den & Hoogeveen, J.A. (2011). Recoverable robustness by column generation. In P. de Causmaecker, J. Maervoet, T. Messelis, K. Verbeeck & T. Vermeulen (Eds.), Proceedings of the Twenty-Third Benelux Conference on Artificial Intelligence. Gent.

Bouman, P.C., Akker, J.M. van den & Hoogeveen, J.A. (2011). Recoverable robustness by column generation. In Demetrescu and Halldorsson (Ed.), Algorithms ESA 2011 Vol. 6942. Lecture Notes in Computer Science (pp. 215-226). Springer.

Vermeulen, H.M., Hoogeveen, J.A. & Akker, J.M. van den (2011). Solving the no-wait job shop problem: an ILP and CP approach. In P. de Causmaecker, J. Maervoet, T. Messelis, K. Verbeeck & T. Vermeulen (Eds.), Proceedings of the Twenty-Third Benelux Conference on Artificial Intelligence (pp. 312-319). Gent.

Vermeulen, H., Hoogeveen, J.A. & Akker, J.M. van den (2011). Solving the no-wait job shop problem: an ILP and CP approach. In T. Achterberg & J.C. Beck (Eds.), CPAIOR 2011-Late Breaking Abstracs (pp. 44-46). Berlin.

Hoogeveen, J.A., Akker, J.M. van den & Lauret, Wouter (2011). Using column generation to solve the edge coloring problem. In T. Achterberg & C. Beck (Eds.), CPAIOR 2011 Late breaking abstracts (pp. 38-40). Berlijn.

Kammer, M.L., Akker, J.M. van den & Hoogeveen, J.A. (2010). Identifying and exploiting commonalities for the job-shop scheduling problem. In Proceedings of the 22nd Benelux Conference on Artificial Intelligence (BNAIC 2010). Luxembourg.

Kammer, M.L., Hoogeveen, J.A. & Akker, J.M. van den (2010). Identifying and exploiting commonalities for the job-shop scheduling problem. : Department of Information and Computing Sciences, Utrecht University.

Hoogeveen, J.A. & T'kindt, V. (2010). Minimizing the late number of jobs when the start time of the machine is variable. In 12th International Conference on Project Management and Scheduling (pp. 235-238). Tours.

Akker, J.M. van den, Diepen, G. & Hoogeveen, J.A. (2010). Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs. Journal of Scheduling, 13(6), 561-576.

Akker, J.M. van den, Kooten-Niekerk, M. van & Hoogeveen, J.A. (2010). Optimizing depot locations based on a public transportation timetable. In Proceeding of the 24th European Conference on Operational Research. Lissabon.

Akker, M. van den, Geraerts, R.J., Hoogeveen, J.A. & Prins, C. (2010). Path Planning for Groups using Column Generation. : Department of Information and Computing Sciences, Utrecht University.

Akker, J.M. van den, Geraerts, R.J., Hoogeveen, J.A. & Prins, C. (2010). Path Planning for Groups using Column Generation. In Proceeding of the Third International Conference on Motion in Games (MIG 2010) Vol. 6459. Lecture Notes in Computer Science. Springer.

Diepen, G., Akker, J.M. van den & Hoogeveen, J.A. (2009). Integrated Gate and Bus Assignment at Amsterdam Airport Schiphol. In R.K. Ahuja, R.H. Möhring & C.D. Zaroliagis (Eds.), Robust and Online Large-Scale Optimization (Lecture Notes in Computer Science, 5868) (pp. 338-353). Springer.

Akker, J.M. van den, Diepen, G. & Hoogeveen, J.A. (2009). More Efficient Algorithms for Resource Constrained Project Scheduling. In Models and Algorithms for Planning and Scheduling Problems.

Hoogeveen, J.A., Lenté, C. & T'kindt, V. (2009). Rescheduling for New Orders on a Single Machine with Setup Times. In 13th IFAC Symposium on Information Control Problems in Manufacturing.

Diepen, G., Pieters, B.F.I., Akker, J.M. van den & Hoogeveen, J.A. (2009). Robust Planning of Airport Platform Buses. UU-CS 2009-026. onbekend: UU BETA ICS Departement Informatica.

Hoogeveen, J.A., Akker, J.M. van den & Kammer, M.H.L. (2009). Simulated annealing with commonalities for the job shop scheduling problem. In Models and Algorithms for Planning and Scheduling Problems.

Akker, J.M. van den, Diepen, G. & Hoogeveen, J.A. (2008). Integrated gate and bus assignment at Amsterdam Airport Schiphol. In International Workshop on Column Generation 2008.

Diepen, G., Akker, J.M. van den & Hoogeveen, J.A. (2008). Integrated gate and bus assignment at Amsterdam Airport Schiphol. UU-CS 2008-041. onbekend: UU WINFI Informatica en Informatiekunde.

Diepen, G., Akker, J.M. van den & Hoogeveen, J.A. (2008). Integrated gate and bus assignment at Amsterdam Airport Schiphol (Extended abstract). In Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems (ATMOS 2008)..

Akker, J.M. van den & Hoogeveen, J.A. (2008). Minimizing the number of late jobs in a stochastic setting using a chance constraint. Journal of Scheduling, 11(1), 59-70.

Akker, J.M. van den, Diepen, G., Hoogeveen, J.A. & Smeltink, J.W. (2007). A Column Generation Based Destructive Lower Bound for Resource Constrained Project Scheduling Problems. UU-CS 2007-005. onbekend: UU WINFI Informatica en Informatiekunde.

Akker, J.M. van den, Diepen, G. & Hoogeveen, J.A. (2007). A Column Generation Based Destructive Lower Bound for Resource Constrained Project Scheduling Problems. In P. van Hentenrijck & L. Wolsey (Eds.), Integration of AI and OR Techniques for Constraint Programming for Combinatorial Optimization Problems (CPAIOR 2007) Vol. 4510. Lecture Notes in Computer Science (pp. 376-390). Springer-Verlag Berlin Heidelberg.

Hoogeveen, J.A. & Wijgers, R. (2007). A column generation approach for examination timetabling. UU-CS 2007-002. onbekend: UU WINFI Informatica en Informatiekunde.

Hoogeveen, J.A. & Penninkx, E. (2007). Finding Near-Optimal Rosters Using Column Generation. UU-CS 2007-001. onbekend: UU WINFI Informatica en Informatiekunde.

Hoogeveen, J.A. & Penninkx, E. (2007). Finding near optimal schedules using column generation. In E. Burke & H. Rudova (Eds.), Practice and theory of automated timetabling (pp. 437-438). Brno: Masaryk University.

Hoogeveen, J.A., Norden, L. & Velde, S.L. van de (2007). Lower bounds for minimizing total completion time in a two-machine flow shop. Journal of Scheduling, 9, 559.

Diepen, G., Akker, J.M. van den & Hoogeveen, J.A. (2007). Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs. In 8th Workshop on Models and Algorithms for Planning and Scheduling Problems.

Hoogeveen, J.A., Cheng, T.C.E., He, Y., Ji, M. & Woeginger, G.J. (2007). Scheduling with step-improving processing times. Operations Research Letters, 34, 37-40.

Diepen, G., Akker, J.M. van den, Hoogeveen, J.A. & Smeltink, J.W. (2007). Using column generation for gate planning at Amsterdam Airport Schiphol. UU-CS 2007-018. onbekend: UU WINFI Informatica en Informatiekunde.

Akker, J.M. van den, Hoogeveen, J.A. & Kempen, J.M. van (2007). Using column generation to solve parallel machine scheduling problems with minmax objective functions. In 8th Workshop on Models and Algorithms for Planning and Scheduling Problems.

Akker, J.M. van den, Hoogeveen, J.A. & Kempen, J.W. van (2006). Parallel Machine Scheduling Through Column Generation: Minimax Objectives (extendedn abstract). In Y. Azar & T. Erlebach (Eds.), ESA 2006 (pp. 648-659).

Diepen, G., Akker, J.M. van den, Hoogeveen, J.A. & Smeltink, J.W. (2006). Using column generation to plan gates and buses at Amsterdam Airport Schiphol. In 10th International Conference on Computer-Aided Scheduling of Public Transport.

Akker, J.M. van den, Hoogeveen, J.A. & Velde, S.L. van de (2005). Applying column generation to machine scheduling. In G. Desaulniers, J. Desrosiers & M.M. Solomon (Eds.), Column generation (Gerad) (pp. 303-331). New York: Springer-Verlag.

Vandevelde, A., Hoogeveen, J.A., Hurkens, C.A.J. & Lenstra, J.K. (2005). Lower bounds for the head-body-tail problem on parallel machines: a computational study of the multiprocessor flow shop. INFORMS Journal on Computing, 17(3), 305-320.

Diepen, G., Akker, J.M. van den & Hoogeveen, J.A. (2005). Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs. CS-UU 2005-054. onbekend: UU WINFI Informatica en Informatiekunde.

Hoogeveen, J.A. (2005). Multicriteria scheduling. European Journal of Operational Research, 167(3), 592-623.

Akker, J.M. van den, Hoogeveen, J.A. & Kempen, J.W. van (2005). Parallel machine scheduling through column generation: minimax objective functions, release dates, deadlines and/or generalized precedence constraints. CS-UU 2005-27. onbekend: UU WINFI Informatica en Informatiekunde.

Diepen, G., Akker, J.M. van den, Hoogeveen, J.A. & Smeltink, J.W. (2005). Solving the gate-assignment problem using column generation. In 7th Workshop on Models and Algorithms for Planning and Scheduling.

Yu, W., Hoogeveen, J.A. & Lenstra, J.K. (2004). Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard. Journal of Scheduling, 7(5), 333-348.

Akker, J.M. van den & Hoogeveen, J.A. (2004). Minimizing the Number of Tardy Jobs. In J.Y.-T. Leung (Ed.), Handbook of Scheduling, Algorithms, Models and Performance Analysis (Computer and Information Science Series). Chapman & Hall.

Akker, J.M. van den & Hoogeveen, J.A. (2004). Minimizing the number of late jobs in case of stochastic processing times with minimum succes probabilities. UU-CS 2004-67. Utrecht: Utrecht University: Information and Computing Sciences.

Akker, J.M. van den, Hoogeveen, J.A. & Velde, S.L. van de (2002). Combining column generation and Lagrangean relaxation to solve a single-machine common due date problem. INFORMS Journal on Computing, 14, 37-51.

Hoogeveen, J.A. & Woeginger, G.J. (2002). Some comments on sequencing with controllable processing times. Computing, 68, 181-192.

Hoogeveen, J.A. & Woeginger, G.J. (2001). A very difficult scheduling problem with communication delays. Operations Research Letters, 29, 241-245.

Hoogeveen, J.A., Schuurman, P. & Woeginger, G.J. (2001). Non-approximability results for scheduling problems with minsum criteria. INFORMS Journal on Computing, 13, 157-168.

Hoogeveen, J.A. (2001, November 21). Produce or procure: How many jobs can you get on time in an uncertain environment ? Eindhoven, The Netherlands, Voordracht in de BETA Workshop on supply chain optimization.

Hoogeveen, J.A. (Ed.). (2001). Journal of Scheduling.

Hoogeveen, J.A. (Ed.). (2001). Operations Research Letters.

Hoogeveen, J.A. (2001, June 18). The three-machine proportionate flow shop problem with unequal machine speeds. Aussois, France, Voordracht op conferentie Fifth Workshop on Models and Algorithms for Planning and Scheduling Problems, MAPSP'01.

Hou, S. & Hoogeveen, J.A. (2001). The three-machine proportionate flow shop problem with unequal machine speeds. In Fifth Workshop on Models and Algorithms for Planning and Scheduling Problems MAPSP'01. Aussois, France.

Hoogeveen, J.A. & Vestjens, A.P.A. (2000). A best possible deterministic on-line algorithm for minimizing maximum. SIAM Journal on Discrete Mathematics, 13, 56-63.

Hoogeveen, J.A. (2000, April 19). Minimizing makespan in a pallet-constrained flowhop. Osnabrueck (Duitsland), Conferentie Seventh International workshop on project management and scheduling.

Hoogeveen, J.A., Potts, C.N. & Woeginger, G.J. (2000). On-line scheduling on a single machine: maximizing the number of early jobs. Operations Research Letters, 27, 193-198.

Hoogeveen, J.A., Skutella, M. & Woeginger, G.J. (2000). Preemptive scheduling with rejection. In M. Patterson (Ed.), Proceedings 8th Annual European Symposium on Algorithms, ESA 2000 (pp. 268-277). Berlin, Germany: Springer-Verlag.

Akker, J.M. van den, Hoogeveen, J.A. & Vakhania, N. (2000). Restarts can help in the on-line minimization of the maximum delivery time on a single machine. Journal of Scheduling, 3, 333-342.

Hoogeveen, J.A. (2000, June 14). Restarts can help in the on-line minimization of the maximum delivery time on a single machine. Eindhoven, Wiskunde seminar.

Akker, J.M. van den, Hoogeveen, J.A. & Vakhania, N. (2000). Restarts can help in the on-line minimization of the maximum delivery time on a single machine. In M. Paterson (Ed.), Proceedings ESA 2000 (pp. 427-436). Springer-Verlag.

Raaymakers, W.H.M. & Hoogeveen, J.A. (2000). Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing. European Journal of Operational Research, 126, 131-151.

Hoogeveen, J.A. (Ed.). (2000). Journal of Scheduling.

Hoogeveen, J.A. (Ed.). (2000). Operations Research Letters.

Sethi, S.P., Sriskandarajah, C., Velde, S.L. van de, Wang, M.Y. & Hoogeveen, J.A. (1999). Minimizing makespan in a pallet-constrained flowshop. Journal of Scheduling, 2, 115-133.

Hoogeveen, J.A. & Kawaguchi, T. (1999). Minimizing total completion time in a twomachine flowshop: analysis of special cases. Mathematics of Operations Research, 24, 887-910.

Hoogeveen, J.A. & Velde, S.L. van de (1999). Scheduling with target start times. European Journal of Operational Research.


valid-html401 webmaster@cs.uu.nl, Tue, 22 May 2012 11:29:44 +0200 ← Departement Informatica, Universiteit Utrecht